BSE SME-listed logistics company Paradeep Parivahan Limited (PPL) has secured a 10-year contract from the JSW Group to deploy 100 electric heavy-duty trucks for industrial bulk transportation. The Odisha-based company disclosed the order to BSE on 24 October 2026 under Regulation 30 of the SEBI Listing Regulations. The electric fleet will transport clinker and slag from Nandyal in Andhra Pradesh to Vijayanagar in Karnataka, two key locations in JSW’s cement and steel operations. PPL, which has its registered office at Paradeep port and its corporate office in Bhubaneswar, provides end-to-end logistics services to industrial customers.
Key Terms of the Contract
The agreement is a tripartite arrangement between Paradeep Parivahan Limited, JSW Cement Limited and JSW Eco-Mobility Private Limited. Under it, PPL will deploy 100 electric trucks for JSW’s industrial operations over the 10-year tenure, with a total cargo quantity of approximately 1,25,000 metric tonnes (MT) to be handled every month on the Nandyal–Vijayanagar route.
Other terms of the agreement, including its value, have not been disclosed due to confidentiality obligations. The company has stated that the contract does not fall under related party transactions and that its promoter, promoter group and group companies have no interest in the awarding entities. The truck model, the charging or battery-swapping arrangement and the date of fleet deployment have not been made public.
Route Links JSW’s Steel and Cement Operations
The corridor connects two closely linked JSW sites. JSW Cement’s integrated plant at Nandyal has an installed grinding capacity of 4.2 MMTPA and clinker capacity of 2.81 MMTPA as of FY25, and produces Portland Slag Cement using blast furnace slag generated at JSW Steel’s Vijayanagar plant in Karnataka. JSW Cement also operates a 6.0 MTPA grinding unit at Vijayanagar. The movement of clinker and slag between these two locations creates a fixed, high-volume route suited to dedicated electric haulage. The Nandyal plant also uses 12.92 MW of waste heat recovery power and 15.45 MW of solar power in its manufacturing process.
According to its 29 September 2026 disclosure to the stock exchanges, JSW Cement has a total cement grinding capacity of 24.10 MTPA and clinkerisation capacity of 9.74 MTPA. The company is India’s largest manufacturer of ground granulated blast furnace slag (GGBS), with a market share of about 84% in GGBS sales.
JSW’s Push into Electric Commercial Vehicles
The contract follows the JSW Group’s entry into electric commercial mobility. On 22 September 2026, JSW Greentech Limited, the group’s commercial electric vehicle company, launched its brand AMPSTAR to design, manufacture and sell electric buses and trucks in India. The vehicles will be built at a 90-acre greenfield facility at AURIC, Chhatrapati Sambhajinagar, Maharashtra, with an annual capacity of 15,000 electric buses and trucks.
AMPSTAR’s truck range begins with a 55-tonne tractor-trailer, with tippers and fixed-body dumpers planned in the coming months. The company is offering vehicles together with charging infrastructure, operating solutions, financing and after-sales support, with ownership options that include outright purchase, leasing and Battery as a Service (BaaS). The vehicles use an in-house drivetrain and software, a double-cooling battery system and a high-strength monocoque chassis, with power configurations from 150 kW to 500 kW. JSW Greentech CEO Sumit Mittal said the company is designing and building its vehicles in India for Indian road conditions. At the launch, JSW Group Chairman Sajjan Jindal said customers will adopt electric vehicles only when the economics make sense, and linked the transition to energy security and lower logistics costs. The companies have not stated whether AMPSTAR vehicles will be used under the Paradeep Parivahan contract.
Paradeep Parivahan’s Growing Electric Fleet Portfolio
The JSW order is PPL’s second long-term electric trucking engagement this year. On 23 January 2026, the company announced an eight-year agreement with UltraTech Cement Limited for EV-based bulk logistics between UltraTech’s facilities in Rajasthan and Uttar Pradesh, in partnership with Energy In Motion Limited (EIM). In June 2026, EIM and PPL commenced deployment of approximately 45 EIM Ashwa 4×2, 55-tonne electric heavy-duty vehicles for UltraTech on that corridor.
Earlier this month, on 9 October 2026, PPL disclosed a separate road transportation contract from JSW Cement for moving cement, GGBS and other specified bulk materials from JSW Cement’s Raigad facility in Maharashtra to customer-designated destinations. The two-year contract runs from 1 November 2026 to 31 October 2028 and can be extended by mutual consent. Alongside it, PPL proposes to acquire 100 commercial bulkers, and the company estimates that the associated business could contribute approximately ₹30 crore in incremental annual revenue and around ₹2.5 crore in annual profit after tax.
Outlook
With a fixed 10-year tenure and a defined monthly volume, the contract gives Paradeep Parivahan long-term visibility for its electric fleet operations and extends its EV logistics presence from northern India to the southern industrial belt. For JSW, it brings electric haulage to a high-volume link within its own steel-to-cement supply chain. The next milestones will be the finalisation of vehicles and charging infrastructure and the start of operations on the Nandyal–Vijayanagar route, for which timelines are yet to be announced. Updates on the fleet rollout are expected through PPL’s future stock exchange disclosures.
Official Sources
- Paradeep Parivahan Ltd – Regulation 30 Disclosure: Receipt of Contract from JSW Group (BSE, 24 October 2026): https://www.bseindia.com/xml-data/corpfiling/AttachLive/cccb2822-9067-4a6e-b7ba-aac40f221e12.pdf
- Paradeep Parivahan Ltd – Disclosure: Receipt of Contract from JSW Cement for Transportation of Cement/GGBS and GBS (BSE, 9 October 2026): https://www.bseindia.com/xml-data/corpfiling/AttachLive/85fd96a3-110f-4d76-9402-e1b72357d0d7.pdf
- Paradeep Parivahan Ltd – Press Release: 8-Year EV Logistics Agreement with UltraTech Cement (BSE filing, 23 January 2026): https://bsmedia.business-standard.com/_media/bs/data/announcements/bse/23012026/d01badb0-895d-49fd-9dc9-2a6aee85e40c.pdf
- Paradeep Parivahan Ltd – Press Release: Deployment of Electric Heavy-Duty Vehicles with EIM for UltraTech Cement (BSE, 17 June 2026): https://www.bseindia.com/xml-data/corpfiling/AttachHis/78113d3c-9271-4e67-ae87-08370ce827c1.pdf
- JSW Group – Press Release: JSW Group Powers into Electric Commercial Mobility with AMPSTAR (22 September 2026): https://www.jsw.in/newsroom/press-releases/jsw-group-powers-into-electric-commercial-mobility-with-ampstar/
- JSW Cement Ltd – Press Release on Outcome of Board Meeting (BSE, 29 September 2026): https://www.bseindia.com/xml-data/corpfiling/AttachLive/cceba6e6-d719-4d44-a374-284fd9615345.pdf
- JSW Cement Ltd – Facilities (Nandyal Integrated Plant, Vijayanagar): https://jswcement.in/about-us/facilities-vijayanagar-works
- JSW Cement Ltd – Results Conference Call Investor Presentation (plant capacities): https://www.jswcement.in/pdf/Results-Conference-Call-Investor-Presentation.pdf

Leave a Comment