The Central Electricity Regulatory Commission (CERC) has adopted the tariffs discovered in SJVN Limited’s 600 MW ISTS-connected wind auction, known as Wind-3. Four developers won the 600 MW: KPI Green Energy Ltd (300 MW), Urdhvaga Renewables India Project Pvt Ltd (120 MW), Adyant Enersol Pvt Ltd (110 MW) and Lambent Energy (Eight) Pvt Ltd (70 MW). Three of them will supply power at Rs 3.64/kWh and Lambent at Rs 3.65/kWh. The order is dated 14 October 2026.
SJVN 600 MW Wind-3 tariff: who won what
According to the order, SJVN was designated as an intermediary procurer and Renewable Energy Implementing Agency (REIA) by the Ministry of New and Renewable Energy (MNRE). It issued the Request for Selection (RfS) for 600 MW of ISTS-connected wind projects on 16 September 2025, under the Ministry of Power’s wind bidding guidelines of 26 July 2023. Winners can set up their projects anywhere in India. The final results were:
| Developer | Capacity (MW) | Tariff (Rs/kWh) |
|---|---|---|
| Urdhvaga Renewables India Project Pvt Ltd | 120 | 3.64 |
| Adyant Enersol Pvt Ltd | 110 | 3.64 |
| KPI Green Energy Ltd | 300 | 3.64 |
| Lambent Energy (Eight) Pvt Ltd | 70 | 3.65 |
In total, 530 MW was awarded at Rs 3.64/kWh and 70 MW at Rs 3.65/kWh. SJVN issued Letters of Award to all four developers on 19 March 2026.
How the auction ran
The auction used a single-stage, two-envelope process (a technical bid and a financial bid), followed by an e-reverse auction. The first bid deadline of 31 October 2025, with technical bids due to open on 3 November 2025, was extended several times through corrigenda and finally set at 6 January 2026, at the request of bidders. In all, 15 bids offering a combined 3,110 MW were received, more than five times the 600 MW on offer. The conformity certificate quoted in the order calls this adequate participation. The bids, as listed in the order, ranged from 50 MW to 300 MW each, with several companies, including KPI, Torrent, Purvah, Jindal, Refex and Waaree, quoting 300 MW.
The financial bids of the technically qualified bidders were opened on 26 February 2026, and the e-reverse auction was held on the ISN-ETS portal on 27 February 2026.
Terms in the letters of award
The order reproduces the Letter of Award issued to Adyant Enersol as an example. It shows 110 MW at Davangere in Karnataka, connected at the 220 kV ISTS substation at Davangere, with a declared annual capacity utilisation factor (CUF) of 30% and a tariff of Rs 3.64/kWh. After the award, the developer may change the project location and the connection point, as the RfS allows. The tariff stays fixed for the entire term of the power purchase agreement (PPA).
The letter also sets out the main obligations of a winning developer:
- a success charge of Rs 1 lakh per MW plus 18% GST;
- a performance bank guarantee of Rs 33.30 lakh per MW before the PPA is signed;
- submission of company documents within 60 days of the award;
- financial closure six months before the scheduled commissioning date; and
- supply of the full contracted wind capacity within 24 months from the effective date of the PPA.
These terms come from the Adyant letter. The order does not repeat each letter for the other three winners.
Price comparison
SJVN told the Commission that the Wind-3 prices compare well with the 1,200 MW ISTS-connected wind auction (Tranche-XIX) run by another REIA in February 2026, where tariffs ranged from Rs 3.67/kWh to Rs 3.69/kWh, with a lowest tariff of Rs 3.67/kWh. SJVN also pointed to its own earlier wind tenders: Wind-1 at Rs 3.98/kWh and Rs 3.99/kWh for 170 MW in total, and Wind-2 at Rs 3.74/kWh and Rs 3.81/kWh for 312 MW in total. The Commission noted that the Wind-3 prices of Rs 3.64/kWh to Rs 3.65/kWh are consistent with price-discovery patterns for similar wind projects. VYQON earlier reported on the CERC order for SECI’s 1.2 GW ISTS-connected wind auction.
Buyer and trading margin
SJVN informed the Commission that Uttar Pradesh Power Corporation Limited (UPPCL) has given in-principle consent, in a letter dated 18 July 2026, to buy the full 600 MW at a tariff of Rs 3.71/kWh to Rs 3.72/kWh, which includes a trading margin of Rs 0.07/kWh. UPPCL asked for the whole 600 MW to be reserved for it and for the power sale agreement (PSA) to be executed on priority. The in-principle consent is not a signed PSA.
SJVN had also asked the Commission to approve the trading margin of Rs 0.07/kWh. The order notes that long-term trading margins are decided mutually between the trading licensee and the seller, and that the margin is deemed to be in line with the regulations if the distribution companies agree to Rs 0.07/kWh. If SJVN does not provide an escrow arrangement or an irrevocable, unconditional and revolving letter of credit, the margin is limited to Rs 0.02/kWh.
What it means for India’s wind sector
The Wind-3 result adds another data point for ISTS-connected wind tariffs, which in these two auctions came out at around Rs 3.64 to Rs 3.69 per kWh. For KPI Green Energy, the largest winner with 300 MW, and for the three other developers, the next steps are signing PPAs with SJVN and building the projects within the 24-month window after PPA effective date. Whether the full 600 MW reaches commissioning depends on the PSA with UPPCL being signed and on grid connectivity at the chosen ISTS substations. VYQON will report on the PSA and PPA signings when they are announced.
Official references
- Central Electricity Regulatory Commission, order in Petition No. 234/AT/2026 (SJVN Limited, Wind-3 tariff adoption): https://cercind.gov.in/2026/Orders/234-AT-2026.pdf