POWERGRID Bihar Grid Strengthening Tariff: CERC Fixes Rs 13.66 Crore Annual Charge for 2024-25

The Central Electricity Regulatory Commission (CERC) has trued up the 2019-24 transmission tariff and determined the 2024-29 tariff for Power Grid Corporation of India Limited’s (POWERGRID) Bihar Grid Strengthening Scheme in the Eastern Region. The order in Petition No. 555/TT/2025 is dated 18 November 2026 and carries CERC Website S. No. 567/2026. For 2024-25, the Commission allowed annual fixed charges (AFC) of Rs 1,365.81 lakh, about Rs 13.66 crore, for the POWERGRID Bihar Grid Strengthening tariff covering the existing assets. The assets are long-standing ones, with commercial operation dates in 2004, so this is a routine tariff order rather than a new project.

What the petition covered

POWERGRID filed the petition for truing up of the 2019-24 tariff under the CERC (Terms and Conditions of Tariff) Regulations, 2019, and for determination of the 2024-29 tariff under the 2024 Tariff Regulations, with the Commission’s Members Ramesh Babu V. and Harish Dudani on the bench. The assets were treated as a Combined Asset made up of two parts:

  • Asset-I: the third 400/220 kV, 315 MVA inter-connecting transformer (ICT) at the Biharshariff sub-station, with associated bays. Its commercial operation date (COD) is 1 April 2004.
  • Asset-II: the rest of the Bihar grid strengthening scheme, with a COD of 1 November 2004. It includes the Sasaram-Arrah-Khagaul 220 kV double-circuit line, LILO (line in line out) connections of the Dehri-Sahupuri 220 kV line at Sasaram and of the Dumraon-Arrah 132 kV line at Arrah, a new Arrah sub-station with two 100 MVA ICTs, two 315 MVA ICTs and four 220 kV line bays at Sasaram, and two 220 kV line bays at Khagaul.

The Combined Asset has a notional COD of 1 November 2004. The respondents are the beneficiaries of the Eastern Region, including the Bihar State Power (Holding) Company Ltd, the West Bengal State Electricity Distribution Company Ltd and the Grid Corporation of Orissa Ltd.

Capital cost and de-capitalisation

The opening capital cost as on 1 April 2019 was Rs 11,429.14 lakh, about Rs 114.29 crore, the same figure the Commission had approved earlier in Petition No. 390/TT/2019. During 2021-22, POWERGRID de-capitalised a gross block of Rs 733.68 lakh, about Rs 7.34 crore, after a 315 MVA ICT-II at Sasaram was diverted to the Jeypore sub-station under another scheme in the Eastern Region. The capital cost as on 31 March 2024 was therefore Rs 10,695.46 lakh, about Rs 106.95 crore, which is the opening cost for the 2024-29 period.

Trued-up charges for 2019-24

The Commission allowed trued-up AFC for the five years as follows, against what POWERGRID claimed (Rs lakh):

Advertisement
  • 2019-20: claimed 1,681.97, allowed 1,681.97
  • 2020-21: claimed 1,694.02, allowed 1,694.01
  • 2021-22: claimed 1,563.63, allowed 1,563.60
  • 2022-23: claimed 1,546.50, allowed 1,546.47
  • 2023-24: claimed 1,566.98, allowed 1,566.95

The differences between the claimed and allowed amounts are a few hundredths of a lakh at most, so the claim was accepted almost in full.

Tariff for 2024-29

For the existing assets, the Commission allowed the following AFC (Rs lakh), against the claims shown:

  • 2024-25: claimed 1,365.83, allowed 1,365.81
  • 2025-26: claimed 1,387.82, allowed 1,389.03
  • 2026-27: claimed 1,411.79, allowed 1,411.95
  • 2027-28: claimed 1,437.59, allowed 1,437.77
  • 2028-29: claimed 1,461.51, allowed 1,461.71

In 2024-25 the allowed charge was built from depreciation of Rs 177.20 lakh, interest on loan of Rs 65.25 lakh, return on equity of Rs 394.23 lakh, interest on working capital of Rs 39.20 lakh and operation and maintenance (O&M) expenses of Rs 689.93 lakh. O&M expenses rise each year and reach Rs 846.74 lakh in 2028-29, which accounts for much of the increase in the annual charge over the period, while interest on loan falls from Rs 65.25 lakh to Rs 5.44 lakh.

For new equipment (replacement) in 2028-29, POWERGRID claimed Rs 35.03 lakh and the Commission allowed Rs 28.84 lakh.

Advertisement

Other directions

The Commission allowed POWERGRID to file a single consolidated petition covering security expenses, capital spares costing more than Rs 10 lakh each, and insurance expenses on an estimated basis for 2024-29, in line with Regulation 36(3)(d) of the 2024 Tariff Regulations. It also held that POWERGRID can recover the filing fee and the publication expenses for the petition directly from the beneficiaries.

The charges are recovered monthly and shared by beneficiaries and long-term transmission customers under the 2020 Sharing Regulations, in line with Regulation 57 of the 2019 Tariff Regulations for 2019-24 and Regulation 78 of the 2024 Tariff Regulations for 2024-29. The order disposes of the petition.

What it means for India’s clean-energy sector

The order does not add new capacity, but it settles how much revenue POWERGRID can recover from the Eastern Region’s beneficiaries for a set of 220 kV and 400 kV assets that carry power in and around Bihar. Predictable regulated tariffs for existing transmission assets are part of what keeps the grid financeable, and the shared-charge mechanism spreads these costs among users rather than placing them on a single utility.

The steady rise in AFC through 2028-29, driven mainly by O&M expenses, also shows how the cost of keeping old assets in service is treated under the 2024 Tariff Regulations. For distribution utilities and other beneficiaries in the Eastern Region, the figures give a clear basis for budgeting transmission payments for the period.

Official references

  1. Central Electricity Regulatory Commission, Order in Petition No. 555/TT/2025 dated 18 November 2026 (CERC Website S. No. 567/2026): https://cercind.gov.in/2026/Orders/555-TT-2025.pdf