GERC Adopts Rs 3.51-3.52 per kWh Tariffs for GUVNL’s 500 MW Wind Power Procurement Under Phase XI

The Gujarat Electricity Regulatory Commission (GERC) has adopted the tariffs discovered in Gujarat Urja Vikas Nigam Limited’s (GUVNL) Phase XI wind power tender, clearing the procurement of 500 MW of grid-connected wind power at Rs 3.51 and Rs 3.52 per kWh. The order in Petition No. 2757 of 2026 is dated 19 November 2026 and covers 250 MW of base capacity plus 250 MW under the greenshoe option. GUVNL buys the power on behalf of Gujarat’s four distribution companies.

GERC GUVNL wind tariff: what the Commission decided

GUVNL asked the Commission to adopt the tariffs discovered through RfS No. GUVNL/250 MW/Wind (Phase XI) dated 30 April 2026 and its addendums, and to allow it to sign Power Purchase Agreements (PPAs) with the successful bidders. The Commission, headed by Chairman Pankaj Joshi with Members Hiren Shah and Jatin N. Thakkar, found the tendering process, including the e-reverse auction, to be transparent and adopted the tariffs for four bidders: Powerica Limited, NLC India Renewables Limited, Juniper Green Energy Limited and CU-Built Renewable Energy Private Limited.

The respondents raised no objection at the hearing on 17 November 2026. The Commission directed GUVNL to sign the PPAs and to file copies of the executed agreements with it on an affidavit. After the PPAs are signed, GUVNL must publicly disclose the names of the successful bidders and their quoted tariffs on its website for 30 days. Under the tender terms, bidders sign the PPA within 15 business days of the tariff being adopted.

How the 500 MW was allocated

The tender sought 250 MW of grid-connected wind capacity from projects to be set up, under construction or already commissioned anywhere in India, with a greenshoe option of up to 250 MW more. GUVNL received bids from seven bidders for 485 MW in total, and all seven qualified technically. The e-reverse auction was held on 9 July 2026 (see VYQON’s earlier report on the Phase XI auction result).

In the auction, Powerica won 50 MW, NLC India Renewables 100 MW and Juniper Green Energy 50 MW, all at Rs 3.51 per kWh, while CU-Built won 50 MW at Rs 3.52 per kWh. KPI Green Energy Limited bid Rs 3.52 per kWh for 100 MW and Kintech Synergy Private Limited bid Rs 3.54 per kWh for 35 MW; neither won capacity.

Advertisement

GUVNL’s board approved the procurement on 29 July 2026. On 12 August 2026 GUVNL offered each winner additional greenshoe capacity equal to its winning capacity at the lowest tariff of Rs 3.51 per kWh. CU-Built accepted 50 MW and NLC India Renewables accepted 100 MW. Powerica and Juniper Green declined their 50 MW offers each, and the 100 MW they turned down was offered to NLC India Renewables, which accepted it. The greenshoe therefore totalled 250 MW. GUVNL issued Letters of Intent on 19 October 2026, and all four bidders accepted them between 21 October and 3 November 2026.

The final allocation is:

  • NLC India Renewables: 300 MW at Rs 3.51 per kWh (100 MW base plus 200 MW greenshoe)
  • CU-Built Renewable Energy: 100 MW at an aggregate Rs 3.515 per kWh (50 MW at Rs 3.52 plus 50 MW at Rs 3.51)
  • Powerica: 50 MW at Rs 3.51 per kWh
  • Juniper Green Energy: 50 MW at Rs 3.51 per kWh

Why GUVNL is buying more wind

GUVNL told the Commission that the generation from these PPAs would be available after about 24 months and would help meet renewable purchase obligations (RPO). It said wind power is needed to complement its large solar tie-ups, because wind generation is generally higher during non-solar hours and helps in grid balancing. GUVNL also pointed to the Gujarat government’s Kisan Suryoday Yojana, under which it is tying up solar capacity for daytime power to farmers. The Commission’s RPO rules require wind purchase obligations to be met from wind capacity commissioned after 31 March 2024.

According to GUVNL’s data as on 31 August 2026, it had tied up 6,728 MW of wind capacity, of which 5,197 MW was commissioned, with 1,530 MW in the pipeline.

Advertisement

Tariff context

The filing compares the Phase XI result with other recent wind tenders. GUVNL’s Phase X, held on 31 December 2025, discovered Rs 3.43-3.44 per kWh, so Phase XI is about Rs 0.08 per kWh higher; GUVNL called the increase reasonable given market conditions and higher project development costs. Other recent wind tenders it cited ended at Rs 3.78-3.85 per kWh (SECI Tranche XX) and Rs 3.88-3.89 per kWh (SJVN Wind-4), and the Phase XI tariffs were described as competitive against those.

What it means for India’s clean-energy sector

The order shows a state buyer still contracting wind capacity at a time when large solar volumes are being added, with the aim of balancing the daily supply profile. The tariffs are fixed for 25 years, and the order moves the 500 MW from bid result to contract stage. The next step to watch is the signing of the four PPAs within the timeline set by the tender.

Official references

1. Gujarat Electricity Regulatory Commission, Order in Petition No. 2757 of 2026 (GUVNL v. Powerica Limited & Ors.), dated 19 November 2026, adoption of tariff for RfS No. GUVNL/250 MW/Wind (Phase XI): https://gercin.org/viewdocument/T3JkZXJzX2ZpbGVzXzU5MTVfMTktMTEtMjAyNl85NjQ3NTMz

2. Gujarat Electricity Regulatory Commission, Judgement/Orders listing: https://gercin.org/orders/orders_petition/judgement_orders