GERC Closes KP Energy, ACME Pokhran Solar Wind RTU Petitions as Withdrawn After Both Install Units

The Gujarat Electricity Regulatory Commission (GERC) has disposed of petitions by KP Energy Limited and ACME Pokhran Solar Pvt. Limited linked to its rule requiring a remote terminal unit (RTU) at every wind turbine generator (WTG). In orders dated 20 November 2026, it recorded both petitions as unconditionally withdrawn; the ACME Pokhran Solar disposal is subject to the company filing a withdrawal affidavit within a week. Both developers said they had since installed the units. The State Load Despatch Centre (SLDC) said turbine data integration and testing remain incomplete.

Key Details of the Orders

The two petitions concerned the same rule in GERC’s Tariff Order No. 05 of 2024 dated 31 August 2024. Both were heard on 19 November 2026 in hybrid mode.

  • KP Energy (Petition No. 2435 of 2025): filed on 27 December 2024 for its 28.6 MW wind project at Vagra in Gujarat’s Bharuch district, with 12 WTGs (5 x 2.1 MW, 4 x 2.8 MW and 3 x 2.3 MW). It sought permission to send the required real-time data through its supervisory control and data acquisition (SCADA) system as an alternate compliance mechanism, and an interim arrangement to commission on that basis.
  • ACME Pokhran Solar (Petition No. 2439 of 2025): sought in-principle approval to treat RTU installation at its own cost as a change in law event under its power purchase agreement (PPA) dated 14 December 2022. It also sought directions to the SLDC to grant an extension of about three months to implement the tariff order, and permission to commission 26.4 MW of 50 MW of wind capacity without an RTU at each WTG.

The orders do not state the cost of the RTUs, and they do not rule on ACME Pokhran Solar’s change in law request, which was withdrawn with its petition.

The KP Energy Project

KP Energy told the Commission that a daily order of 17 January 2025 allowed it to commission the 28.6 MW on an interim basis, provided real-time electrical and weather data from each WTG reached the SLDC through the SCADA gateway. According to the company, it commissioned 25.8 MW, comprising 11 WTGs, between 22 January 2025 and 28 January 2025, and the last 2.8 MW WTG on 17 February 2025.

The company said it has installed an RTU on each WTG and that the SLDC, in a submission dated 14 April 2025, recorded RTUs at all 12 WTGs. It argued that the petition had therefore become infructuous. It filed an affidavit for withdrawal on 7 November 2026, which was served on the SLDC the same day.

Advertisement

The SLDC did not object. Its counsel, Advocate Ranjitha Ramachandran, said that, as per the SLDC’s information, the integration of low and high voltage ride-through (LVRT/HVRT), wind speed and wind direction data is complete for 3 WTGs and pending for the other 9. She added that the sequence of events (SOE) buffer test is also pending, and that the project had been allowed to commission without insisting on certain tests because of the Commission’s interim orders. With the petition withdrawn, she said, the SLDC will proceed with its requirements and coordinate with KP Energy.

The ACME Pokhran Solar Project

ACME Pokhran Solar’s counsel said the Commission had granted interim protection allowing the project to be commissioned without RTUs, with data sent to the SLDC through a SCADA gateway. He said the developer has since installed RTUs at every WTG and the project has been commissioned, so the petition had become infructuous. He agreed to file an affidavit for unconditional withdrawal.

The respondents, Gujarat Urja Vikas Nigam Limited (GUVNL) and the SLDC, raised no objection. Ramachandran, appearing for both, said the developer had been allowed to commission without certain requirements while the petition was pending. She added that the integration of LVRT, HVRT, weather data and wind speed parameters and the SOE buffer test may now be completed, with the SLDC coordinating with the developer.

What the Tariff Order Requires

GERC’s tariff framework for wind projects says developers shall install an RTU at the pooling station as well as at each WTG at their own cost, to transfer real-time data to the SLDC for monitoring. During consultation, the Indian Wind Energy Association argued that RTUs at each WTG would increase project cost and that an RTU at the pooling station should be sufficient.

Advertisement

The Commission did not accept that view. It said an RTU on each WTG is necessary for the SLDC to monitor energy injection in real time, and it accepted the SLDC’s suggestion.

A Related Ruling on the Same Day

In a separate order also dated 20 November 2026, GERC rejected a 90-day force majeure claim by Solarcraft Power India 3 Private Limited for installing RTUs at each WTG of its 200 MW wind project in Gir Somnath district. The Commission cited its ruling in the Juniper Green Kite case, which held the RTU rule to be a regulatory compliance requirement and not an event rendering performance impossible.

The Commission also noted that the tariff order was issued about 222 days before the project’s extended scheduled commercial operation date (SCOD). It added that Solarcraft had placed no material showing that the commissioning of any WTG was held up by the rule.

Outlook

The SLDC told the Commission it will coordinate with both developers to finish the outstanding integration work and SOE buffer tests. The ACME Pokhran Solar disposal also rests on its affidavit reaching the Commission within the one-week deadline set in the order.

Official Sources

  1. Gujarat Electricity Regulatory Commission – Order in Petition No. 2435 of 2025, KP Energy Limited vs Gujarat SLDC (20 November 2026): https://gercin.org/viewdocument/T3JkZXJzX2ZpbGVzXzU5MjRfMjAtMTEtMjAyNl8zMzE1Mjg1
  2. Gujarat Electricity Regulatory Commission – Order in Petition No. 2439 of 2025, ACME Pokhran Solar Pvt. Limited vs GUVNL and SLDC (20 November 2026): https://gercin.org/viewdocument/T3JkZXJzX2ZpbGVzXzU5MjlfMjEtMTEtMjAyNl8zMzU2NTE0
  3. Gujarat Electricity Regulatory Commission – Order in Petition No. 2578 of 2025, Solarcraft Power India 3 Private Limited vs GUVNL (20 November 2026): https://gercin.org/viewdocument/T3JkZXJzX2ZpbGVzXzU5MjdfMjEtMTEtMjAyNl83NjAxNzEy
  4. Gujarat Electricity Regulatory Commission – Order No. 05 of 2024, Tariff Framework for Procurement of Power from Wind Power Projects (August 2024): https://gercin.org/viewdocument/T3JkZXJzX2ZpbGVzXzI5NV8wNi0wMS0yMDI2XzU0NjQyNzI=