SECI BESS Empanelment: Rolling Panel Opens for Suppliers Across Four Tiers Up to 1,000 MWh

SECI BESS empanelment has opened for battery storage suppliers, integrators and aggregators. The Solar Energy Corporation of India Limited (SECI) issued a Request for Empanelment (RfE) on 17 November 2026 to build a qualified panel of grid-interactive battery energy storage system (BESS) suppliers, sorted into four capacity tiers of up to 1,000 MWh. The RfE number is SECI/C&P/OP/11/0009/26-28, and the work is titled “Rolling Empanelment of BESS Suppliers, Integrators, and Aggregators across Capacity Tiers for Grid-Interactive BESS Deployments”.

The panel is meant to supply BESS for SECI’s own projects. Companies that qualify will later compete in project-specific electronic reverse auctions, so the RfE itself involves no price bids.

What SECI is asking for

SECI describes itself in the document as a “Navratna” Government of India enterprise under the Ministry of New and Renewable Energy. In the RfE it says it is working to deploy utility-scale renewable energy and energy storage to meet national decarbonisation targets, improve grid flexibility, manage peak demand and support round-the-clock supply models.

A two-stage process

The procurement runs in two stages. Stage I is the empanelment itself. Bidders are judged only on the technical and financial qualification criteria in the RfE, and those who meet them are empanelled under one of the four tiers. No price bids are submitted at this stage.

Stage II starts when SECI has a specific BESS requirement. It will then issue a project-specific Request for Quotation (RfQ) to the empanelled suppliers eligible for the relevant tier. The RfQ will set out the capacity, site coordinates, interconnection voltage, technical specifications and other conditions. The award will be decided through an electronic reverse auction (e-RA). If the RfE and a Stage II RfQ differ, the RfQ prevails.

SECI states that empanelment only establishes eligibility to take part in later procurement. It is not an award, a purchase order, a minimum business commitment, an exclusivity arrangement or an assurance of any future project. The document does not state how much BESS capacity SECI plans to buy through the panel, nor the project sites.

Advertisement

SECI BESS empanelment: four capacity tiers

The tiers are based on the cumulative BESS capacity a bidder wants to be empanelled for:

  • Tier I: up to 100 MWh
  • Tier II: more than 100 MWh and up to 300 MWh
  • Tier III: more than 300 MWh and up to 600 MWh
  • Tier IV: more than 600 MWh and up to 1,000 MWh

A bidder that qualifies for a higher tier is automatically deemed qualified for the lower tiers. The empanelment period is one year, and renewal may be considered. Bids stay valid for 12 months. Tier upgrades are allowed during the validity period on a monthly evaluation cycle, with a differential fee.

Fees, guarantees and eligibility

Every bid needs a non-refundable bid processing fee of Rs 5,000 plus 18% GST. The yearly empanelment fee depends on the tier: Rs 25,000 for Tier I, Rs 50,000 for Tier II, Rs 75,000 for Tier III and Rs 1,00,000 for Tier IV, each plus 18% GST.

An empanelment bank guarantee is also required, set at Rs 1.86 crore for Tier I, Rs 5.58 crore for Tier II, Rs 11.16 crore for Tier III and Rs 18.60 crore for Tier IV.

On finances, the minimum average annual turnover is Rs 27.90 crore for Tier I, Rs 83.70 crore for Tier II, Rs 167.40 crore for Tier III and Rs 279.00 crore for Tier IV. The turnover must be that of the bidding company and not of a group of companies, and a summary certified by a practising Chartered Accountant or statutory auditor is needed.

On technical experience, the RfE sets a minimum cumulative grid-interactive BESS experience of 10 MWh for Tier I, 30 MWh for Tier II, 60 MWh for Tier III and 100 MWh for Tier IV.

Advertisement

Dates and rolling submissions

The SECI tender page lists the publication date as 17 November 2026, a pre-bid meeting on 25 November 2026 at 14:30, a first bid submission deadline of 30 November 2026 at 18:00 and bid opening on 1 December 2026 at 10:00.

The tender is rolling. According to the RfE, the bid submission deadline is the last working day of each month, and bids are opened on the first working day of the following month. This continues until SECI issues a notice terminating the tender.

What it means for India’s clean-energy sector

A standing panel can shorten the time between a storage requirement and an award. Once suppliers are prequalified on technical experience, turnover and a bank guarantee, SECI can go straight to a project-specific RfQ and an e-reverse auction among them, instead of running a full qualification round for every project.

The tier structure also lets suppliers of different sizes take part. A company with limited experience can enter at Tier I, while larger integrators can qualify for Tier IV and, by default, all lower tiers. The monthly rolling cycle means new entrants can join later, and empanelled firms can move up a tier as their track record grows.

Official references

1. SECI tender page SECI000298, Request for Empanelment of BESS Suppliers: https://www.seci.co.in/tender-details/Ymt_

2. SECI RfE document No. SECI/C&P/OP/11/0009/26-28 dated 17 November 2026 (PDF): https://www.seci.co.in/uploads/tenders/RfE_of_BESS_suppliers_Final_upload.pdf