APTEL Sets Aside APERC Order on Wind Energy Beyond CUF for Four JSW Energy Subsidiaries

The Appellate Tribunal for Electricity (APTEL) has set aside an Andhra Pradesh Electricity Regulatory Commission (APERC) order that directed the state’s distribution companies (AP Discoms) to pay ₹0.50 per unit for wind energy supplied beyond the prescribed capacity utilisation factor (CUF). Four JSW Energy subsidiaries brought the appeal. APTEL directed AP Discoms to pay the applicable generic tariff, irrespective of the CUF, with interest. JSW Energy disclosed the order, dated 17 November 2026, on 18 November 2026.

Key Details

According to JSW Energy’s Regulation 30(4) material litigation update of 18 November 2026:

  • Appellants: JSW Vayu (Tungabhadra) Private Limited, JSW Vayu (Indravati) Private Limited, JSW Wind Power (Pennar) Private Limited and JSW Wind Power Limited, all subsidiaries of JSW Energy
  • Order challenged: APERC order dated 18 October 2023, which directed AP Discoms to pay ₹0.50 per unit for energy supplied beyond the prescribed CUF
  • APTEL order: dated 17 November 2026; the appeal is allowed and the APERC order is set aside
  • Direction: AP Discoms must pay for energy generated by the wind power generators at the applicable generic tariff, irrespective of whether actual generation exceeds the normative CUF
  • Interest: payable together with the principal, in accordance with the respective power purchase agreements (PPAs)

The filing does not state the amount the four subsidiaries expect to recover, the period of generation covered, the capacity of the wind farms involved or the applicable generic tariff. It also does not say whether AP Discoms plan to challenge the order before the Supreme Court.

What the Ruling Changes

Under the APERC order of 18 October 2023, AP Discoms were directed to pay only ₹0.50 per unit for energy the four wind generators supplied beyond the prescribed CUF. APTEL allowed the appeal and set that order aside.

Advertisement

JSW Energy filed the update as a material litigation disclosure under Regulation 30, following up its disclosure of 30 September 2023.

A Long-Running Dispute

The 18 November update refers to JSW Energy’s earlier disclosure of 30 September 2023. That disclosure listed the group’s material litigations. Among them were related earlier petitions filed before APERC by Mytrah Vayu (Tungabhadra) Private Limited, Mytrah Vayu (Indravati) Private Limited and Mytrah Vayu (Krishna) Private Limited against AP Discoms. The petitions challenged “the payment withheld by AP Discoms for the supply of energy over and above 23.5% CUF”, according to that disclosure. The same disclosure names JSW Neo Energy Limited as the parent company of the three Mytrah Vayu companies. The filings do not expressly link the Mytrah Vayu names to the four appellants, and Mytrah Vayu (Krishna) is not among the appellants.

The same 2023 list recorded an appeal before APTEL by Mytrah Vayu (Godavari) Private Limited against an order of the Telangana regulator, also over payment withheld for energy above 23% CUF. A separate petition by the Indian Wind Power Association, filed before the Andhra Pradesh High Court on behalf of various wind power producers, challenged an APERC order allowing AP Discoms to deduct the generation-based incentive amount of ₹0.50/kWh from monthly energy payments. The 2023 disclosure named JSW Neo Energy Limited as a member of the association.

An Earlier APTEL Ruling

JSW Energy disclosed another APTEL ruling in its favour on 19 September 2026. In that filing, the company reported that APTEL, by an order dated 18 September 2026, had set aside a Central Electricity Regulatory Commission (CERC) order of 17 March 2022. That order had disallowed a claim by JSW Hydro Energy Limited for notional interest during construction on equity above 30% infused during construction. APTEL allowed the claim and remanded the matter to CERC for a prudence check of the data on the additional interest.

Advertisement

Two of the four appellants in the CUF case were also rated in November 2026. On 6 November 2026, JSW Energy said India Ratings and Research had assigned IND AA-/Stable ratings to the bank loan facilities of JSW Wind Power (Pennar) Private Limited, JSW Wind Power Limited and JSW Wind Power (Isapur) Limited, all step-down subsidiaries.

About the Company

JSW Energy, part of the JSW Group, began commercial operations in 2000 with its first 2×130 MW thermal power plants at Vijayanagar, Karnataka. According to its media release of 6 November 2026, the company has added 1,784 MW of generation capacity since April 2026, including 1,484 MW of renewable capacity, taking total installed capacity to 15,237 MW.

Renewable energy makes up about 61% of the operational portfolio, or 9,279 MW. This comprises 3,125 MW of wind, 2,457 MW of solar, 1,916 MW of hybrid and 1,781 MW of hydro capacity. The thermal portfolio stands at 5,958 MW. The company has 15.3 GW under construction and targets 30 GW of generation capacity and 40 GWh of energy storage by 2030.

The Company’s Recent Pipeline

  • September 2026: APTEL allows JSW Hydro Energy’s interest-during-construction claim and remands the matter to CERC (order of 18 September).
  • September 2026: JSW Thermal Energy contracts Toshiba JSW Power Systems for two 800 MW steam turbine generators for Phase II of the Salboni Thermal Project in West Bengal, completing turbine-generator orders for the full 3,200 MW (25 September).
  • November 2026: Capacity additions since April 2026 reach 1,784 MW: 1,484 MW of renewables (624 MW solar, 108 MW wind, 601 MW hybrid, 150 MW hydro) and 300 MW of acquired thermal capacity (6 November).
  • November 2026: India Ratings assigns IND AA-/Stable to three wind subsidiaries’ bank facilities (6 November).

Outlook

The next step lies with the AP Discoms, which must now pay the four subsidiaries at the generic tariff, with interest, for energy above the normative CUF. JSW Energy has not disclosed the amount involved or a timeline for payment. The 2023 disclosure also listed a related appeal over payment withheld above 23% CUF, the outcome of which has not been reported in the company’s filings reviewed for this article.

Official Sources

  1. JSW Energy Limited – Material Litigation under Regulation 30(4): Update on APTEL Order in CUF Matter (NSE, 18 November 2026): https://nsearchives.nseindia.in/corporate/KRUTIKAJSWEL_18112026132637_LettertobsenseCUFmatter_sd.pdf
  2. JSW Energy Limited – Disclosure of Continuing Material Events: Status of Material Litigations (NSE, 30 September 2023): https://nsearchives.nseindia.in/corporate/JSWENERGY_30092023142103_LetterBSENSELitigations30September2023.pdf
  3. JSW Energy Limited – Update on Material Litigation: APTEL Order on IDC Claim of JSW Hydro Energy (NSE, 19 September 2026): https://nsearchives.nseindia.in/corporate/AJAYJSWEL_19092026142926_Disclosure_APTEL_IDC_Order_18_Sep_2026_clean.pdf
  4. JSW Energy Limited – Capacity Addition and Media Release (NSE, 6 November 2026): https://nsearchives.nseindia.in/corporate/AJAYJSWEL_06112026171614_LettertoBSENSEFinal.pdf
  5. JSW Energy Limited – Assignment of Credit Rating to Wind Subsidiaries (NSE, 6 November 2026): https://nsearchives.nseindia.in/corporate/AJAYJSWEL_06112026192908_Letter_to_BSENSE_060112026_isapur_pennar_windpowerSd.pdf
Advertisement