CERC Grants Transmission Licence to NERGS III Siang Basin Transmission for Kaying-Niglok-Gogamukh System in Arunachal Pradesh; Quoted Annual Charges ₹4,376.66 Million

The Central Electricity Regulatory Commission (CERC) has granted a transmission licence to NERGS III Siang Basin Transmission Limited for the “NERGS-III Siang Basin” project, a new inter-State transmission system in the North East. The order in Petition No. 272/TL/2026 is dated 23 November 2026. The project will be built, owned, operated and transferred (BOOT), and the lowest annual transmission charge quoted in the competitive bidding is ₹4,376.66 million, or about ₹437.67 crore, a year. The scheduled commercial operation date for all elements is 30 September 2029.

NERGS III Siang Basin transmission: what will be built

The petitioner, NERGS III Siang Basin Transmission Limited, is a 100% wholly owned subsidiary of Dineshchandra R. Agrawal Infracon Private Limited. According to the order, the project has the following main elements:

  • A new 400/220 kV gas-insulated switchgear (GIS) pooling station at Kaying in Arunachal Pradesh, with two 500 MVA transformers (ICTs) and two 80 MVAr bus reactors.
  • A new 400 kV GIS switching station at Niglok in Arunachal Pradesh, with two 500 MVA 400/220 kV ICTs and two 80 MVAr bus reactors.
  • Two 400 kV double-circuit (quad conductor) lines: Kaying-Niglok and Niglok-Gogamukh, with 50 MVAr switchable line reactors in the circuits of the Niglok-Gogamukh line.
  • An extension of the Gogamukh 400/220/132 kV inter-State substation.

The order says the line lengths are tentative and the exact length will be fixed after a detailed survey. The Niglok station is planned with space for a future ±800 kV, 6,000 MW HVDC terminal station (four units of 1,500 MW, line-commutated converter technology). That terminal is listed as additional space for future expansion, not as part of the scope to be built now.

Gogamukh substation and commissioning schedule

The Gogamukh substation is itself being built under the North Eastern Region Expansion Scheme-XVI (NERES-XVI) through the tariff-based competitive bidding route by NERES XVI Power Transmission Limited, a wholly owned subsidiary of Techno Electric and Engineering Company Limited. Its scheduled commissioning date under the transmission service agreement is 30 November 2026. The order requires NERES XVI Power Transmission Limited to provide the space for the new work at Gogamukh free of cost.

Advertisement

The CERC order states that all the elements of the NERGS-III Siang Basin project are required to be commissioned together, because the use of each depends on the commissioning of the others. The common scheduled date is 30 September 2029.

Bidding and regulatory process

PFC Consulting Limited acted as the Bid Process Coordinator under the Ministry of Power’s guidelines issued under Section 63 of the Electricity Act, 2003. Dineshchandra R. Agrawal Infracon Private Limited was declared the successful bidder with the lowest quoted annual transmission charges of ₹4,376.66 million.

The regulatory steps were as follows:

  • The Central Transmission Utility of India Limited (CTUIL) recommended on 11 June 2026 that the licence be granted.
  • CERC proposed the licence prima facie in its order of 29 September 2026.
  • A public notice was published on 7 October 2026 in the Hindustan Times and Dainik Jagran, and no suggestions or objections were received.
  • The matter was heard on 16 October 2026, where the petitioner confirmed that no objection had come in.

The order was passed by Chairperson Jishnu Barua with Members Ramesh Babu V., Harish Dudani and Ravinder Singh Dhillon. CERC found that the company meets the requirements of the Electricity Act and the 2024 transmission licence regulations.

Advertisement

Licence conditions

The licence runs for 25 years from the date of issue unless it is revoked earlier. The licensee may apply two years before expiry for a further term. CERC made the grant subject to one specific condition: distribution companies and consumers shall be liable for tariff corresponding to the hydro generation capacity commissioned and the transmission system used. The Commission said it must ensure that tariff decisions do not impose a financial burden on distribution companies and consumers if transmission assets remain unutilised.

Other conditions in the order include:

  • The licensee must not enter into any contract or business of trading in electricity.
  • It must give non-discriminatory open access to its transmission system.
  • It must follow the directions of the National and Regional Load Despatch Centres, the CEA technical and grid standards and the Standard of Performance regulations.
  • It must pay licence fees under the CERC Payment of Fees Regulations, 2012, and non-payment for more than 60 days counts as a breach.
  • It must award the EPC contract for the project through competitive bidding.
  • CTUIL and the Central Electricity Authority will monitor execution and report any lapse to CERC.

What it means for India’s transmission sector

The order shows how new inter-State lines in the North East are being awarded and licensed: a tariff-based competitive bid run by a bid process coordinator, a CTUIL recommendation and a CERC licence. The condition on tariff liability links the cost of the lines to hydro generation capacity actually commissioned and the system used, which protects consumers if the connected generation is delayed. The provision for a future 6,000 MW HVDC terminal at Niglok also indicates the planning space reserved for later expansion, although it is not part of the licensed scope today.

Official references

  1. Central Electricity Regulatory Commission, Order in Petition No. 272/TL/2026 dated 23 November 2026 (NERGS III Siang Basin Transmission Limited): https://cercind.gov.in/2026/Orders/272-TL-2026-F.pdf